Section 00 11 13
ADVERTISEMENT TO BID
MGL c.149 $50K to $150K
The BARNSTABLE HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Exterior Unit Storm Screen and Non-Unit Exterior Door Replacement at State Aided Development:
436 Bishops Terrace (705)
436 Bishops Terrace, Hyannis, MA 02601
458 Bishops Terrace (705)
458 Bishops Terrace, Hyannis, MA 02601
462 Bishops Terrace (705)
462 Bishops Terrace, Hyannis, MA 02601
Tanbark Road / Moss Place (705)
Tanbark Road / Moss Place, Marstons Mills, MA 02648
442 Bishops Terrace (705)
442 Bishops Terrace, Hyannis, MA 02601
in accordance with the documents prepared by RESCOM ARCHITECTURAL, INC..
The Project consists of but not limited to:
Remove and replace exterior unit entry doors, storm doors and sliding patio doors. New exterior trim and railings.
The work is estimated to cost $82,056.00.
All bidding Requests for Information (RFIs) shall be submitted online by 04/20/2026 at 3:00PM EDT for general bids.
Bids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by
M.G.L. c.149 §§26 to 27H inclusive.
THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED. Please review the instructions in the bid documents on how to register as an electronic bidder. All Bids shall be submitted online at biddocs.com and received no later than the date and time specified.
General Bids will be received until 23 April 2026 at 3:00PM EDT and publicly opened online, forthwith.
General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates) and made payable to the BARNSTABLE HOUSING AUTHORITY. Note: A bid deposit is not required for Projects advertised under $50,000.
Bid Forms and Contract Documents will be available for review at biddocs.com (may be viewed and downloaded electronically at no cost).
The Contractor and all subcontractors (collectively referred to as “the Contractor”) agree to strive to achieve minority and women workforce participation. The Workforce Participation benchmark is set at 6.9% for women and 15.3% for minorities. The Workforce benchmark percentages are a statutory requirement under MGL c. 149 § 44A(2)(G).
PRE-BID CONFERENCE / SITE VISIT: Scheduled
Date and Time: 04/07/2026 at 9:30AM EDT Address: 436 Bishops Terrace, Hyannis, MA 02601 Instructions: None
The hard copy Contract Documents may be seen at: Nashoba Blue Inc.
433 Main Street
Hudson, MA 01749
978-568-1167
March 26, April 2,2026 12192771