Notice to Contractors
WASTEWATER TREATMENT PLANT M-K TUNNEL BRIDGE IMPROVEMENTS PROJECT
CITY OF APPLETON
THE CITY OF APPLETON HAS IMPLEMENTED ONLINE BIDDING USING THE QUEST
CONSTRUCTION DATA NETWORK. ONLY ELECTRONIC BIDS WILL BE ACCEPTED THROUGH
WWW.QUESTCDN.COM
The contract documents may be viewed and downloaded by registering with QuestCDN online (www.questcdn.com). Call (952) 233-1632 or email info@questcdn.com for assistance. This contract is Quest eBidDoc #10230155. Interested parties may view the contract documents at no cost on the QuestCDN website prior to becoming a plan holder. To be considered a plan holder for bids, a contractor must register on QuestCDN.com and purchase the digital contract documents at a non-refundable cost of $22.00. Registering as a plan holder is recommended for all prime contractors and subcontractors as plan holders will receive addenda and other contract document updates via QuestCDN.
For this solicitation, bids will ONLY be received and accepted via the online electronic bid service through QuestCDN.com. Quest will charge a $42.00 fee for this service. Download the bid documents and click the online bidding button at the top of the advertisement to access the electronic bid qualifications and bid worksheet. Bids must be entered and submitted by 1:45 p.m. (C.S.T.) June 23, 2026. Bids will be read at 2:00 p.m. at City Center Building, Sixth Floor, 100 N Appleton Street, Appleton, WI 54911.
Drawings and Specifications have been prepared by McMahon Associates, Inc., 1445 McMahon Drive, Neenah, WI 54956, Attn: Jeffrey A. Kellner, P.E. (920) 751-4200.
The work covered by these Contract Documents consists of demolishing drywall and the associated drywall framing on the east and west M-K tunnel bridge walls, cleaning and painting of the existing interior bridge structural steel framing and insulated metal wall panels, painting of the existing drywall ceiling and painting of the existing north wall of the M-K tunnel bridge, and other items described in the Bidding Documents for the Wastewater Treatment Plant L Building HVAC and Miscellaneous Upgrades Project complete and operational for the City of Appleton, Calumet, Outagamie and Winnebago Counties, Wisconsin.
A non-mandatory pre-bid conference has been scheduled beginning at 10:00 a.m. (C.S.T.) on June 17, 2026, at the City of Appleton Wastewater Treatment Plant, 2006 E. Newberry Street, Appleton, Wisconsin. All Bidders are encouraged to attend.
No bid will be opened unless the "Bidders Proof of Responsibility" for 2026 is filed in the office of the City Clerk not later than five (5) days before bid opening. Forms are included in specifications, and are also available at the office of the City Clerk. The document is available on the City website as noted below and is included within the bid documents.
https://appletonwi.gov/government/departments/clerk/forms.php#outer-329 [bidder's proof of responsibility form]. Reference is made to §66.0901 Wisconsin Statutes.
Sales Tax Exemption: Pursuant to §77.54(9m) certain items purchased by the contractor for this project may be subject to sales tax exemption and, in such cases, contractor shall not pay nor charge the City for said taxes.
Bidder will be required to have Performance Bond/Labor and Material Payment Bond in the amount of 100% of the Contract. Cost of Bond shall be included in Bid.
No bid shall be received unless accompanied by a bid bond equal to five percent of the bid, payable to the City as a guarantee that if the bid is accepted, the bidder will execute and file the proper contract and bond within 10 days from the date the lowest responsible bidder's bid is accepted. If the bidder fails to file such contract and bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages.
The City reserves the right to reject any and all bids or to accept any bid deemed for the best interests of the City and to waive any informalities in the bidding.
DATE: June 2, 2026
AMY MOLITOR
City Clerk
WNAXLP
June 8, 15 2026
LWIX0531672