INVITATION TO BID
1. DATE OF ADVERTISEMENT: June 08, 2026.
PROJECT: The Sunray Agriculture Supply Chain Efficiency Project.
6670 ROAD E
SUNRAY, TEXAS, MOORE COUNTY, TEXAS BID DOCUMENTS
2. Electronic bids must be submitted to Coby Leggett with TGB Group at CobyL@thetgbgroup.com
by June 30, 2026 at 2:00 PM CST.
A. Firms are encouraged to submit written questions related to the services to be provided by Friday, June 19, 2026. Questions from all firms will be combined and answers will be sent out no later than EOB Friday, June 26, 2026.
B. There will be a mandatory onsite Prebid on June 17, 2026 at 10:00 am (Approximate site location 6670 Rd E, Sunray Tx 79086)
C. A contract will be awarded to the firm that presents the best overall value to TXNW.
3. DESCRIPTION OF MAJOR UNITS OF WORK: Unclassified excavation, subballast, ballast and track installation. Project expected to start in July of 2026. All permits shall be obtained by the contractor.
Major Bid items and approximate quantities are listed below:
*Indicates materials that will be purchased by TXNW, but contractor will need to provide labor and equipment to install.
31,882 TF Remove Existing 80#/85# Rail
9 EA *#11 HTTO Turnout 115#
9 EA Remove Existing #9 Turnout
150 TF Rehabilitate Timber Panel X-Ings
80 LF 8' x 6' MBC (MP 1.90)
100 LF 8' x 4' MBC (MP 2.20)
144 LF 8' x 4' MBC (MP 11.40)
1 LS Erosion Control
26 EA *115# - 80# Step Rail Transition
1,078 TF Track Shifting
32,114 TF Track Surfacing
1 LS Timber Disposal
6,800 Tons *Ballast
6,602 EA *8'-6" Grade 4 Timber Ties***
190 EA *10'-0" Grade 5 Timber Ties***
4. For Project manual and bid documents, please contact:
TGB Group, LLC
2257 N Loop 336 W Suite, 140 - 492
Conroe, TX 77304 Contact:
Coby Leggett
Email: CobyL@thetgbgroup.com