ADVERTISEMENT & INSTRUCTIONS FOR SUBCONTRACTOR BIDS
SIERRA STREET BRIDGE REPLACEMENT PROJECT
Notice is hereby given that Q&D Construction, as CM at Risk, requests bids from interested subcontractors to provide labor, equipment and materials for the Sierra Street Bridge Replacement Project.
The Sierra Street Bridge Replacement Project is located on Sierra Street in Downtown Reno at the Truckee River. The project consists of the following subcontractor scopes:
CIDH*, Reinforcing Steel*, Temporary Excavation Shoring*, Girder Hoisting*, Electrical*, Landscaping*, Striping and Signs, Asphalt Cold Milling, Pavers and Granite Veneer, Detail Painting/Staining.
* Subcontractor scopes requiring prequalification
Construction schedule - Project start: Spring 2027, Completion: Summer 2028
Estimated value: $28,000,000
Bid packages available 6/3/2026. Please email Kayla Salitrero ksalitrero@qdconstruction.com or Brett Amesbury bamesbury@qdconstruction.com for bid documents.
RFIs due June 17th @ 5:00 p.m. - email Brett Amesbury bamesbury@qdconstruction.com.
Bids due: July 1st @ 2:30 p.m.
Submit bids in a sealed envelope to:
Q&D Construction LLC
1050 S. 21st Street
Sparks, NV 89431
Attn: Brett Amesbury
Bid for: Sierra Street Bridge Replacement Project
For additional information, please contact Jeff Bean at 775-353-7093 or jbean@qdconstruction.com.
The Sierra Street Bridge Replacement project is a Federally funded project subject to Davis Bacon and State of Nevada prevailing wage requirements.
*NOTICE: Subcontractors, who will perform at least 1% of the estimated value of the work (Estimated Value $28,000,000) or $50,000 whichever is greater, must be qualified pursuant to NRS 338.1669. Proposals will be returned to the subcontractor unopened if the subcontractor has not been qualified per NAC 338.580. The submission of a materially incomplete or falsified application for qualification by an applicant and failure to disclose information required in the application may be grounds for the disqualification of the applicant.
Qualifications received after June 1st, are not guaranteed to be processed prior to the due date for subcontractor proposals. Please call Jeff Bean @ (775) 353-7093 if subcontractor prequalification will be submitted after June 1st, 2026
Q&D in accordance with Code of Federal Regulations, 49 CFR, Part 26, agrees to ensure that disadvantaged business enterprises will be given equal opportunity to submit proposals in response to this request.
June 3, 5, 8 2026