ADVERTISEMENT TO BID
MGL c.149 Under $150K
The MASSACHUSETTS MILITARY DIVISION, the Awarding Authority, invites sealed
bids from Contractors for the project 260331 Replace Boiler 2 Core and Failed BMS Controller at the Joint Base Cape Cod Fire Station at Camp Edwards, Massachusetts, in accordance with the documents prepared by the MA Army National Guard Construction and Facilities Management Office.
The Project consists of but is not limited to:
Remove and dispose of the exiting failed PK boiler core. Install new core, charge the system and start boiler. Replace failed Johnson BMS controller.
The work is estimated to cost $53,000.00
The Construction Workforce Utilization Goals are 15.3% minority workers and 6.9% women workers of the final contract price including accepted alternates.
All bidding Requests for Information (RFIs) shall be submitted online by May 8, 2026 at 2:00pm. Bids are subject to M.G.L. c.149 §44A-J & to minimum wage rates as required by M.G.L. c.149 §§26 to 27H inclusive.
THIS PROJECT IS BEING ELECTRONICALLY BID AND HARD COPY BIDS WILL NOT BE ACCEPTED. All Bids shall be submitted online at http://www.commbuys.com and received no later than the date and time specified.
General Bids will be received until May 13, 2026 at 9:00am and publicly opened online, forthwith.
General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates) and made payable to the MASSACHUSETTS MILITARY DIVISION. Note: A bid deposit is not required for Projects advertised under $50,000.
Bid Forms and Contract Documents will be available for review at www.commbuys.com (may be viewed and downloaded electronically at no cost).
SITE VISIT: Scheduled
Date and Time: May 6, 2026 at 9:00am
Address: 3132 Richardson Rd, Camp Edwards, Buzzards Bay, MA 02542
Email the project manager, Barry Johnson, at barry.j.johnson22.nfg@army.mil for the security access form (matrix). Must meet REAL ID requirements. Arrive 8:15am at Connery Gate for security check-in & escort to site. Check email for any last-minute changes.
Site Visit is MANDATORY for General Contractors & Subcontractors.
April 29 2026
LNEO0505874