INVITATION TO SUBMIT FOR PREQUALIFICATIONS - Maps 4 Multipurpose Stadium M4-VM010 – 6 Southeast 4th Street, OKC, OK (Project) – Lingo Construction Services, LLC, hereinafter called (CM) on behalf of the City of Oklahoma City, hereinafter called the Owner, is seeking Subcontractors qualified and capable of performing the following scopes for the Maps 4 Multipurpose Stadium. Note: Subcontractors prequalified previously under Prequalification 03 shall not need to re-apply. Confirm with CM.
3.01 Masonry
3.06 Millwork
3.07 Lockers
3.08 Waterproofing & Joint Sealants
3.09 Roofing
3.10 Metal Wall Panels
3.11 Fireproofing
3.12 Doors, Frames, and Hardware - Supply
3.13 Doors, Frames, and Hardware - Install
3.14 Doors, Frames, and Hardware - Supply and Install
3.15 Glass and Glazing
3.16 Overhead and Coiling Doors
3.17 Drywall and Framing
3.18 Tile & Carpeting
3.19 Sealed and Stained Floor
3.20 Painting & Wallcovers
3.21 Signage
3.22 Canopies
3.23 Folding Partitions
3.24 Specialties - Supply and Install
3.25 Loading Dock Equipment - Supply and Install
3.26 Facility Fall Protection
3.27 Food Service Equipment and Appliances
3.28 Hydrotherapy Equipment, Pools, and Tubs
3.29 Stage Equipment
3.30 Athletic Equipment
3.31 Window Curtains and Shades
3.32 Stadium Seating
3.33 Furniture, Fixtures, and Equipment
3.34 Elevator
3.35 Fire Suppression
3.36 Plumbing
3.37 HVAC
3.38 Total Mechanical
3.39 Commissioning
3.40 Electrical
3.41 Data & Telecommunications
3.42 Audio Visual
3.43 Scoreboards and Videoboards
3.44 Security Systems
3.45 Site Paving
3.46 Pavers
3.47 Pitch
3.48 Landscape & Irrigation
3.49 Site Furnishings
Subcontractors are invited to respond to this Request for Qualifications (RFQ), by submitting a Statement of Qualifications (SOQ). Subcontractors must comply with all requirements and deadlines contained in this RFQ. Statement of Qualifications will be reviewed to determine which Subcontractors will be deemed Prequalified and eligible to participate in the bidding process for this project. The SOQ is available at local plan rooms and through Building Connected. The SOQ shall be submitted per the RFQ requirements. Your SOQ shall be submitted prior to 2:00 PM central standard time on Thursday June 18th, 2026. Failure to submit a complete SOQ by the submission deadline will result in rejection.
Building Connected
The project can be found on Lingo Construction Services Public Plan Room through Building Connected by using the link below. Building Connected will be used for submissions of all Statement of Qualifications.
Lingo Construction Services Public Plan Room on Building Connected:
https://app.buildingconnected.com/public/5b1801efd80ff0000f69ce7e
CM Office: Lingo Construction Services, LLC 1135 North Robinson Ave, OKC OK 73103. 405-602-2100.
IMPORTANT NOTICE: Participation in the Bidding Phase of Maps 4 Multipurpose Stadium M4-VM010 will be limited to ONLY those Subcontractors who are deemed prequalified. Subcontractors who fail to respond to the RFQ, adhering to all instructions, listed requirements, and deadlines and/or Subcontractors who are not deemed prequalified shall be automatically disqualified from bidding.Note: Subcontractors prequalified previously under Prequalification 03 shall not need to re-apply. Confirm with CM.
LPXLP
May 26, June 2 2026
LOKL0524215