ADVERTISEMENT FOR BIDS
W Layton Avenue (CTH Y)
S 60th Street to S 68th Street
Milwaukee County
City of Greenfield Project No. 2413
Milwaukee County
Project No. WH0292012
BID DATE: Thursday, January 29, 2026
BID OPENING: Bids are required to be submitted electronically through www.questcdn.com. Electronic bids are due 1:00 p.m. Central Standard Time on Thursday, January 29, 2026. Bids received after this time will not be accepted. Bids will be publicly opened after specified closing time in Room 204 at Greenfield City Hall, 7325 W. Forest Home Avenue, Greenfield, WI 53220.
PROJECT DESCRIPTION: The project consists of full concrete pavement, base and curb & gutter replacement, spot repair of storm sewer, sanitary sewer installation and adjustments, curb ramps, sidewalk replacement, traffic control, temporary traffic signals, pavement marking, permanent signing and landscaping on W Layton Avenue (CTH Y) from S 60th Street to S 68th Street. Traffic signal work is also included at the intersection with S 68th Street. Work included in the project corridor shall include the following: concrete pavement replacement, base aggregate, curb & gutter replacement, curb ramps, concrete sidewalk, storm and sanitary sewer structure repairs, utility structure adjustments, traffic signals, street lighting relocations, traffic control, temporary traffic signals, pavement marking, permanent signing, and landscaping.
CONTRACTING AGENCY:
City of Greenfield
Engineering Office, Room 203
7325 West Forest Home Avenue
Greenfield, WI 53220-3356
(414) 329-5325
BASIS OF BIDS REQUIRED: Bids shall be on a unit price basis.
PROJECT SCHEDULE: W Layton Avenue (CTH Y) Stage 1 construction shall be substantially completed prior to noon of July 3, 2026. Stage 2 construction shall not begin prior to July 13, 2026. Project is to be substantially complete no later than Friday, October 30, 2026, and completed and ready for final completion no later than Friday, November 13, 2026. Substantial completion for all stages shall include the completion of all concrete paving, curb and gutter, concrete/asphalt driveways and concrete sidewalk.
PROCUREMENT OF DOCUMENTS: Contract Documents may be obtained only from www.questcdn.com. No paper plan sets will be provided. Access the QuestCDN web site to view and download bid information and documents on or after January 7, 2026, for a non-refundable fee of $22.00. Input QuestCDN eBidDoc No. 9985133 on the QuestCDN Project Search page. Contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in downloading and working with the digital documents. Electronic bids must be submitted on Quest vBid www.questcdn.com for a non-refundable, minimum fee of $42.00.
BID SECURITY: All bids shall be accompanied by Bid Security made payable to Owner, in an amount of five percent of Bidder's maximum Bid price, and in form of a Bid Bond. The bid bond shall be electronically uploaded on Quest prior to submitting a bid.
PUBLIC CONTRACT REQUIREMENTS: Bidder will be required to submit a full and complete statement of financial ability, equipment, experience in the work prescribed in the documents and other items required for protection and welfare of public, in accordance with S.66.0901, Wisconsin Statutes. See Contractor's Qualification Statement below. Procurement of the work and award of the contract will be in accordance with the provisions of S.62.15, S.66.0901, S.66.0903 and S.779.16, Wisconsin Statutes.
CONTRACTOR'S QUALIFICATION STATEMENT: Contractor must be on the Wisconsin Department of Transportation Prequalified Contractors List.
RIGHT TO REJECT BIDS: Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time, or changes in the Work, and the right to disregard all non-conforming, non-responsive, unbalanced, or conditional Bids.
CONTRACT SECURITY: Bidder awarded a contract for the Work shall be required to furnish a Performance Bond and a Payment Bond in full amount of contract price.
CONTRACT AWARD: Owner reserves the right to select bid which best suits its needs, whether price is lowest or not. Owner also reserves the right to reject any or all bids and to waive irregularities therein. All bidders agree that such rejection shall be without liability on part of Owner or its Engineer for any penalty brought by any Bidder because of such rejections, nor shall bidders seek recourse of any kind against Owner or its Engineer because of such rejections. Filing of any bid in response to this Invitation shall constitute an agreement of Bidder to these conditions. No Bidder may withdraw its bid for a period of sixty (60) days from date specified for opening of bids.
Issued By Authority of:
City of Greenfield
Bryan Haas
City Engineer
Dates of Publication:
January 7, 2026
January 14, 2026
WNAXLP
January 7, 14 2026
LWIX0430324