PUBLIC NOTICE
MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY
OFFICE OF POLLUTION CONTROL
P. O. BOX 2261
JACKSON, MISSISSIPPI 39225-2261
601-961-5171
The Mississippi Department of Environmental Quality (MDEQ) has established a public comment period for the Draft FY 2026 Water Pollution Control Revolving Loan Fund (WPCRLF) Intended Use Plan (IUP). The public comment period on this document extends from the date of this announcement through May 20, 2026. Written comments will be accepted on this document through May 20, 2026, and should be addressed to the attention of Greg Eiler at the above address.
MDEQ will also hold a public hearing on Wednesday, May 20, 2026, at 11:00 a.m. in the Commission Hearing Room in the offices of MDEQ located at 515 E. Amite Street in Jackson, Mississippi, to receive written or verbal comments on this document regardless of how they are received, equal consideration will be given to all comments prior to final adoption of this document.
The Draft FY 2026 IUP is available for viewing and downloading on the MDEQ website by going to www.mdeq.ms.gov/cwsrf, then choosing the related link under “Documents.” Hard copies of the Draft FY 2026 IUP may also be requested by calling 601-961-5108.
Brent Jones, P.E., Chief
SWD, Construction Branch
April 16,23,30,2026 12244351