Bureau Valley HS 5th Grade Classroom & Gymnasium Addition
Sealed bids for multiple bid packages in the construction of the Bureau Valley High School 5th Grade & Gymnasium Addition at Bureau Valley High School will be received by the Board of Education of Bureau Valley Community Unit School District #340, Bureau County, Illinois, at the Bureau Valley District Office, 9068 2125 North Ave, PO Box 289, Manlius, Illinois 61338, until 1:00 p.m. central prevailing time on Thursday, the 9th day of October, 2025.
Bid Packages for Bid Phase 1: (Combination Bids will be allowed)
BP 01 – Site Demo, Site Utilities, Earthwork
BP 02- Site Concrete & Asphalt
BP 03 – Building Concrete
BP 04 - Masonry
BP 05 – Steel Fabrication and Erection
BP 06 – General Trades & Interior Demolition
BP 07 – Roofing
BP 08 – Doors, Frames, Hardware (Material Only)
BP 09 – Aluminum Windows, Storefront, Curtain wall
BP 10 – Framing Drywall Acoustical Ceilings
BP 11 – Painting
BP 12 – Flooring
BP 13 – Fire Protection
BP 14 – Plumbing
BP 15 – HVAC & Temperature Controls
BP 16 – Electrical and Fire Alarm
BP 17 – Athletic Equipment
BP 18 – Bleachers
BP 19 –Athletic Flooring (Wood at Gym)
BP 20 – Resinous Flooring (Epoxy) BP 21 – Sports flooring (Resilient Athletic Flooring)
BP 22 – Precast Panels (Furnish and install)
The Bid Documents are available from Midwest Construction Professionals. Contact Jeff Pflederer at jeff@midconpro.com.
All bids must be accompanied with bid security in the form of a bid bond, certified check or a cashier's check, made payable to Bureau Valley Community Unit School District #340 in the amount of five percent (5%) of the bid amount. The bidder shall, within said ten (10) days, provide a Performance and Payment Bond, with a Surety to be approved by the District, in the amount of 100% of the cost of the contract, the cost of which shall be included in the bid. The form of the Performance and Payment Bond is subject to approval of counsel for the District.
Each bidder expressly agrees that such bid may not be withdrawn for a period of sixty (60) days from the opening thereof. Withdrawal within such period shall subject the bidder to forfeiture of Bid Bond, as well as penalties and damages to the District to the extent that such withdrawal results in loss to the District.
The Board of Education reserves the right to reject any and all bids or any part thereof, to waive any informalities, errors or irregularity in bids received or in the bidding process, and to accept the bid that the Board of Education deems the most favorable to its interest after all bids have been examined and canvassed. The Board of Education will award the contract to the lowest responsible bidder that meets the criteria as established in the specifications and the contract will be awarded only after a formal notice is given to the successful bidder pursuant to action by the Board of Education.
DATED this 10th day of September 2025.
Board of Education,
Bureau Valley Community Unit School District #340
September 14 2025
LILS0369118