Murray Middle School – Phase II (New 2 Story Bldg, Demolition & ODP Equipment Installation)
Notice is hereby given that Hedrick Brothers Construction Co., Inc. (Construction Manager) for Martin County School District (Owner) will receive sealed proposals from qualified subcontractors for the Murray Middle School Phase 1 Project, located at 4400 SE Murray Street, Stuart, Florida 34997.
Bid Packages (Subcontractors)
Phase II will include the remaining balance of construction required to complete the Murray Middle School modernization project following the Phase I Early Works and Early Procurement package. The scope includes demolition of Building #05 & #09, select gymnasium demolition, a 44,869 GSF 2 story building, including concrete, masonry, brick veneer, rough carpentry, millwork, fireproofing/stopping, roofing, caulking & waterproofing, doors/frames/hardware, glazing, stucco, interior framing and drywall, ACT, flooring, painting, specialties, equipment, , window treatments, canopies, fire sprinkler, plumbing, HVAC systems (including installation of Dual path AHUs, DX 100% OH AHUs, Water-cooled chiller, Chilled water and condensate pumps, VAVs and VFDs), electrical systems (including installation of Switchgear & 1 MTS transfer switch), fire alarm, DAS, BDA, communications, AV, access control, video surveillance, lightning protection, and final campus improvements such as final sitework, landscaping & irrigation, permanent fencing, testing, closeout, and commissioning. In addition, the existing Gymnasium Building #6 will be modernized and scope includes demolition of the existing flooring, bleachers and HVAC systems. Building #6 also includes new lighting, athletic flooring, bleachers, paint and repairs to the existing metal roof. See ITB & Bid Documents for further information and bid package narratives which will be available on 06/15/26 through Building Connected.
This scope excludes early procured ODP equipment and early works already addressed under Phase I, as well as demolition of Buildings 10 and 18, temporary access road, structural steel package, elevator package, existing chiller removals, secondary electrical duct bank, buried communication vault removals, temporary fencing/barricades, vibro replacement scope, and related early testing/surveying/site-enabling activities.
Hedrick Brothers Construction Co., Inc. is currently soliciting sealed bids from qualified subcontractors for the above Bid Packages. Interested subcontractors shall contact Wanda Stan by e-mail at wstan@hedrickbrothers.com for access to bid documents, procurement requirements, and proposal instructions. No phone calls.
Plans, specifications, equipment schedules, procurement documents, and proposal requirements will be made available through Building Connected. Subcontractors are responsible for reviewing all issued documents, addenda, schedules and delivery requirements prior to submitting a proposal.
Hedrick Brothers Construction Co., Inc. is currently prequalifying subcontractors for the project through Compass. While prequalification is not mandatory to submit a bid, subcontractors must be prequalified prior to award. Bidders who are not prequalified at the time of award may be deemed non-responsive or otherwise ineligible for award consideration.
All interested bidders are strongly encouraged to begin the prequalification process as soon as possible. Please contact Wendy Papa by email at HBPrequal@hedrickbrothers.com for prequalification instructions. No phone calls, please.
The contents of the prequalification questionnaire and all associated documents will be considered confidential and used solely to determine your firm's qualifications. This information will not be disclosed to any other parties.
Important Dates:
06/15/26: ITB Available through Building Connected.
06/23/26: Pre-Bid Meeting / Site Visit (4400 SE Murray Street, Stuart, Florida 34997 @ 10:00 AM)
06/26/26: RFI's due
07/10/26: Bids due by 2:00 PM
The Jessica Lunsford Act security screening and security requirements will be in effect for all workers on site during the entire project duration. Sealed proposals will be received at Hedrick Brothers Construction Co., Inc. offices located at 2200 Centrepark West Drive, West Palm Beach, Florida 33409, or may be submitted electronically through Building Connected which will remain sealed until bid opening date & time.
All equipment, materials, submittals, delivery, coordination, and closeout requirements shall comply with the project documents, Martin County School District standards and applicable codes and Authority Having Jurisdiction.
Owner and/or Construction Manager reserve the right to reject any or all proposals, to accept any proposal which is in its best interest, and to waive any informalities and technicalities in procedure.
All costs incurred by subcontractors to prepare and submit a proposal shall be the sole responsibility of the proposer.
June 7, 14, 21 2026
LSAR0531576