NE Hubbell Avenue Water & Force Mains Public Hearing Notice
NOTICE OF PUBLIC HEARING ON PLANS AND SPECIFICATIONS, PROPOSED FORM OF CONTRACT, AND ESTIMATE OF COST FOR CONSTRUCTION OF THE NE HUBBELL AVENUE WATER AND FORCE MAINS PROJECT FOR THE CITY OF BONDURANT, IOWA
At 6:00 P.M. on the 15th day of June, 2026, the City Council of said City will, in said Council Chambers, hold a hearing and said Council proposes to adopt plans, specifications, form of contract and estimate of cost and, at the time, date and place specified above, or at such time, date and place as then may be fixed, to act upon proposals and enter into a contract for the construction of the following improvements:
NE HUBBELL AVENUE WATER AND FORCE MAINS
Construct improvements, including all labor, materials, and equipment necessary for the construction of water and sewer force mains along NE Hubbell Avenue as shown on plans. Work includes; clearing and grubbing, approximately 15,300 linear feet of 14" HDPE sanitary sewer force main using a combination of trenched and trenchless methods, approximately 958 linear feet of 14" HDPE sanitary sewer force main installed via trenchless methods inside of a casing pipe, approximately 10,700 linear feet of 30" HDPE water main using a combination of trenched and trenchless methods, approximately 400 linear feet of 30" HDPE water main installed via trenchless methods inside a casing pipe, air release valve pits, butterfly valves, hydrants, fittings and appurtenances, and miscellaneous associated work including cleanup.
Also included is Bid Alternate A, which consists of approximately 48 linear feet of 18" HDPE water main installed via trenched methods, approximately 230 linear feet of 18" HDPE water main installed via trenchless methods inside a casing pipe, gate valves, one hydrant, fittings and appurtenances, and miscellaneous associated work, including cleanup.
At said hearing, the City Council will consider the plans, specifications, proposed form of contract, and estimated total cost for the project, the same now being on file in the office of the City Clerk, reference to which is made for a more detailed and complete description of the proposed improvements, and at said time and place the said Council will also receive and consider any objections to said plans, specifications, estimate of cost and form of contract made by any interested party.
The work to be done on this project is generally located inside of the Iowa DOT right-of-way along the west side of NE Hubbell Avenue/Highway 330.
This notice is given by order of the Council of the City of Bondurant, Iowa.
CITY OF BONDURANT, IOWA
Doug Elrod, Mayor
ATTEST:
Marketa George Oliver, City Administrator
June 10 2026
LIOW0530656