Public Notice
Santa Rita Connection Project
Your input is needed!
Join us for an open house on March 4, 2026
Tucson Electric Power (TEP) is preparing plans for new transmission facilities that will increase energy capacity and enhance system reliability to customers in Sahuarita, Green Valley, and the surrounding area.
TEP will share the results of a transmission line siting study for the Santa Rita Connection Project. We will be presenting alternative routes that could be used to connect the Sonoran and Santa Rita substations.
Your input will help determine TEP's decision for the preferred route. Visit our webpage to learn more about the project or contact a team member at 520-770-7520.
Public Open House | Reunión abierta pública
Wednesday, March 4 | Miercoles 4 de marzo
6 to 8 p.m. | De 6 a 8 p.m.
Desert Diamond Casino - Sahuarita
1100 W Pima Mine Road Sahuarita, AZ 85629
¡Su opinión es necesaria!
Acompáñenos en una reunión abierta pública el 4 de marzo de 2026
Tucson Electric Power (TEP) está preparando planes para nuevas instalaciones de transmisión que aumentarán la capacidad energética y mejorarán la fiabilidad del sistema para los clientes de Sahuarita, Green Valley y sus alrededores.
TEP compartirá los resultados de un estudio de emplazamiento de líneas de transmisión para el Proyecto de Conexión de Santa Rita. Presentaremos rutas alternativas que podrían utilizarse para conectar las subestaciones Sonoran y Santa Rita.
Su opinión ayudará a determinar la decisión de TEP para la ruta preferida. Visite nuestra página web para conocer más sobre el proyecto o póngase en contacto con un miembro del equipo al 1-520-770-7520.
Project webpage: tep.com/santa-rita-connection/